Heavy DutyCoating System

Commercial Solid Color Epoxy & Polyurea

Auto Shops · High Traffic · Heavy Load

Warranty

Ask for written warranty terms with your quote

Cure Time

Follow written return-to-use instructions

Consultation

Free on-site

System overview

What makes this system different

A 100% solids epoxy base with polyurea topcoat suited for commercial environments — forklifts, hydraulic jacks, and constant foot traffic. Used in auto shops, warehouses, car dealerships, and showrooms. The solid color system provides a clean, professional appearance with optional anti-slip aggregate. Custom color matching available. Ask for written warranty terms and return-to-use guidance with your quote.

Ideal for

Auto repair shopsWarehousesCar dealershipsManufacturing facilitiesRetail showroomsAirplane hangars

Key features

What's included

  • Forklift compatible
  • Chemical and oil resistant surface
  • Anti-slip aggregate available
  • Ask about written warranty terms
  • Custom color matching for brand consistency
  • 100% solids epoxy — no water or solvents
  • Seamless, easy-to-clean surface
  • Available in safety colors (yellow, red, gray)

Installation process

How it's installed

1

Shot Blast or Diamond Grind

Commercial jobs use shot blasting or industrial diamond grinding for maximum surface profile — critical for adhesion under heavy loads.

2

Crack & Joint Assessment

Cracks, control joints, and spalls are assessed and addressed as part of surface preparation. Joint treatment is specified based on the selected system and intended use.

3

100% Solids Epoxy Basecoat

Commercial-grade 100% solids epoxy applied. No water, no solvents — maximum film build for heavy-load environments.

4

Polyurea Topcoat + Anti-Slip

Aliphatic polyurea topcoat for UV stability and abrasion resistance. Anti-slip aggregate available where needed for safety.

Common questions

Frequently asked

Can this handle forklift traffic?

Our commercial system uses 100% solids epoxy with a polyurea topcoat suited for forklift and heavy equipment traffic. Discuss your specific load requirements during the consultation.

How long does a commercial job take?

Depends on square footage and scope. Most commercial jobs complete in 1–2 days. Larger facilities may be phased to minimize downtime. We discuss scheduling during the site review.

Can you match our brand colors?

Yes — we offer custom color matching. Bring a paint chip, Pantone code, or RAL number and we'll match it.

Is anti-slip aggregate required?

Not required, but recommended for areas with vehicle traffic, wet conditions, or where slip resistance is a priority. We'll advise based on your facility and intended use.

Do you work after hours to minimize downtime?

Yes — we can schedule evening and weekend installs for facilities that can't close during business hours. Contact us to discuss your schedule.

Ready to get started?

Schedule your free on-site consultation

We test your slab, recommend the right system, and give you a written quote — no pressure.

Get a Free Quote