Planning a commercial warehouse floor coating in Orlando
1Assessment
Active warehouses with forklift traffic require assessment of oil contamination, spalling, and crack severity. Operational downtime constraints affect scheduling and phasing. Shot blast preparation is typically needed for oil-contaminated slabs.
2Options
Commercial solid color epoxy with a polyurea topcoat handles forklift and heavy equipment traffic. Safety markings (pedestrian walkways, forklift lanes) can be included. Anti-slip aggregate is available for areas with wet conditions. Phased installation can minimize operational downtime.
3Confirm before work begins
Confirm the preparation scope, system specification, safety marking layout, return-to-use timing, and written warranty terms before work begins. Discuss your operational schedule so installation can be planned around your downtime.